Groomer Shed – Gravel Work Party

Map Unavailable

Date/Time
Date(s) - September 23, 2016
10:30 am - 4:00 pm

Categories


WORK PARTY

-to spread and level gravel on the Interrior floor of the building.

-tractor with bucket and blade will do most of the heavy work

-bring a rake and shovel to do the edges.

-for more info call John 204-451-0481